Pathline Project Planner MCP server
online · 100% uptimeio.github.theluckystrike/critical-path·v1.0.0Project planning tool for critical path calculations.
Little public usage data yet
Reviews
Write oneNobody has reviewed Pathline Project Planner yet.
If you have run it, two minutes of your experience saves the next person an afternoon.
Pathline Project Planner tools (1)
write = sends, deletes, buys or postscalculate_critical_pathFreeUse this when the user wants a critical path calculation, project duration, earliest/latest task starts and finishes, or task slack from explicit durations and dependencies. Accepts one to forty tasks, at most 160 finish-to-start dependencies, and durations with at most three decimal places. Includes parallel critical tasks and a CSV schedule. Does not schedule calendar dates, generate Gantt charts, account for resources or holidays, or infer missing task durations.
Public scan report
scanner v0.1.10 · 2026-10-25 · same rubric, same numbers if you re-run it
- –Code scanremote-only server, no package to scann/a
- Live reliabilityremote reachable in 985ms20/20
- Tool poisoning1 tool descriptions checked15/15
- Auth qualityopen endpoint, read-only tools10/15
- Maintenanceno repository listed3/15
- Maintainer identityno repository or website to verify2/10
Findings (1)
- lowNo source repository listed
maint.no-repo
How Pathline Project Planner compares
Against every graded MCP server, from our own scans and uptime checks. Updated after each scan run.
- Safety score
- 67/100
- higher than 25% of 48,255 servers
- Tools
- 1
- the typical server has 7
- Tools that change things
- 0%
- typical: 0%. Fewer write tools means less an agent can break
- Uptime
- 100%
- of our recent checks; the typical remote server answers 100%
- Response time
- 145 ms
- faster than 74% of 30,031 servers
What its tools let an agent do: 1 read
Install Pathline Project Planner in Claude Code, Cursor or VS Code
claude mcp add --transport http critical-path https://critical-path.zovo.one/mcp
Pathline Project Planner: common questions
- Is Pathline Project Planner MCP server safe?
- With care: it is graded C, so read the findings first (67/100). Read the Pathline Project Planner safety report
- How do I install Pathline Project Planner?
- It runs remotely at critical-path.zovo.one. Add it to Claude Code, Cursor, VS Code or Claude Desktop with the snippets above, or call it through the mcp.market gateway without installing anything.
- Does Pathline Project Planner need an API key?
- Not as far as the registry entry and our scan can tell: no credentials are declared or required.
- Is Pathline Project Planner maintained?
- The latest release is v1.0.0.
- Is Pathline Project Planner up?
- 100% of our last 28 checks got an answer. We check remote servers about four times a day.
- How does Pathline Project Planner compare with other MCP servers?
- safety score 67/100 (higher than 25% of 48,255 servers); tools 1 (the typical server has 7); tools that change things 0% (typical: 0%. Fewer write tools means less an agent can break). Full comparison.