{"name":"io.github.theluckystrike/critical-path","slug":"theluckystrike-critical-path","title":"Pathline Project Planner","description":"Project planning tool for critical path calculations.","url":"https://mcp.market/server/theluckystrike-critical-path","rating":null,"grade":"C","score":67,"certified":false,"status":"active","category":"other","tags":[],"presence":{"score":8,"stars":null,"forks":null,"downloads_week":null,"last_push_at":null,"license":null},"uptime":{"percent":100,"checks":28,"ok":28,"last_checked_at":"2026-11-04T07:30:56.465Z","last_ok_at":"2026-11-04T07:30:56.465Z","latency_ms":145},"claimed":false,"transport":"remote","callable_via_gateway":true,"default_price_micros":0,"repository":null,"website":"https://critical-path.zovo.one/","version":"1.0.0","remotes":[{"type":"streamable-http","url":"https://critical-path.zovo.one/mcp"}],"packages":[],"tools":[{"name":"calculate_critical_path","description":"Use this when the user wants a critical path calculation, project duration, earliest/latest task starts and finishes, or task slack from explicit durations and dependencies. Accepts one to forty tasks, at most 160 finish-to-start dependencies, and durations with at most three decimal places. Includes parallel critical tasks and a CSV schedule. Does not schedule calendar dates, generate Gantt charts, account for resources or holidays, or infer missing task durations.","write_action":false,"price_micros":0,"input_schema":{"type":"object","properties":{"project":{"description":"Project label, e.g. Website launch.","type":"string","maxLength":80},"unit":{"description":"A single elapsed-time unit for all task durations, e.g. days. Defaults to days; no business calendar is applied.","type":"string","enum":["days","hours","weeks"]},"tasks":{"minItems":1,"maxItems":40,"type":"array","items":{"type":"object","properties":{"id":{"type":"string","minLength":1,"maxLength":20,"description":"Unique dependency ID, e.g. design."},"name":{"description":"Task label, e.g. Design mockups. Defaults to its ID.","type":"string","maxLength":50},"duration":{"type":"number","minimum":0,"maximum":1000000,"description":"Elapsed duration in the chosen unit, with at most three decimal places, e.g. 2.5. Zero denotes a milestone."},"depends_on":{"description":"Finish-to-start predecessor IDs, e.g. [\"design\"]. Omit for a starting task.","maxItems":39,"type":"array","items":{"type":"string","minLength":1,"maxLength":20,"description":"Predecessor task ID, e.g. design."}}},"required":["id","duration"]},"description":"Tasks in any order, e.g. [{\"id\":\"A\",\"duration\":3},{\"id\":\"B\",\"duration\":5,\"depends_on\":[\"A\"]}]."}},"required":["tasks"],"$schema":"http://json-schema.org/draft-07/schema#"}}],"scan":{"score":67,"grade":"C","scanned_at":"2026-10-25T16:30:56.494Z","report":{"scannerVersion":"0.1.10","scannedAt":"2026-10-25T16:30:56.482Z","components":{"code":{"score":-1,"max":25,"notes":["remote-only server, no package to scan"]},"reliability":{"score":20,"max":20,"notes":["remote reachable in 985ms"]},"poisoning":{"score":15,"max":15,"notes":["1 tool descriptions checked"]},"auth":{"score":10,"max":15,"notes":["open endpoint, read-only tools"]},"maintenance":{"score":3,"max":15,"notes":["no repository listed"]},"identity":{"score":2,"max":10,"notes":["no repository or website to verify"]}},"findings":[{"id":"maint.no-repo","severity":"low","component":"maintenance","title":"No source repository listed"}],"inputs":{"probes":[{"url":"https://critical-path.zovo.one/mcp","reachable":true,"authRequired":false,"latencyMs":985,"serverInfo":{"name":"critical-path","version":"1.0.0"}}],"packages":[],"repo":{"found":false},"icon":{"url":"https://critical-path.zovo.one/icon.svg","source":"site"},"presence":{"stars":null,"forks":null,"downloadsWeek":null,"license":null,"lastPushAt":null,"score":8}}}},"grade_history":[],"reviews":[]}