Zovo Project Timeline MCP server
online · 100% uptimeio.github.theluckystrike/gantt-timeline·v1.0.0A Gantt chart maker and project timeline planner that works inside the chat.
Little public usage data yet
Reviews
Write oneNobody has reviewed Zovo Project Timeline yet.
If you have run it, two minutes of your experience saves the next person an afternoon.
Zovo Project Timeline tools (2)
write = sends, deletes, buys or postscompare_timeline_scenariosFreeUse this when the user asks what happens to a project schedule if a task slips, takes longer or shorter, or starts later: for example "if Design slips 5 days, when do we finish?" or "does the critical path change?". Takes the same task list and calendar as plan_project_timeline plus 1 to 4 scenarios, each with changes (extra_days, a new duration, or a new start-no-earlier-than date). Returns the baseline and each scenario's end date, the delay in working and calendar days, the new critical path, tasks that became or stopped being critical, and how much of each slip was absorbed by float. Does not change or save the plan. Do not use for the first schedule of a project (use plan_project_timeline).
plan_project_timelineFreeUse this when the user wants a Gantt chart, project timeline, project schedule or project plan with milestones from a task list, wants to find the critical path and project duration, or asks for early start, early finish, late start, late finish, total float or free float (critical path method). Takes tasks with durations (days or weeks), finish-to-start dependencies with optional lags, optional start-no-earlier-than dates, owners and milestones, plus a start date and a business-day calendar with country public holidays or calendar days. Returns every task's dates and float, the critical path, milestones and the end date, an interactive Gantt chart, and CSV, .ics and SVG downloads. Detects dependency loops and unknown task names. Does not save projects, sync with project tools, track progress, or level resources. Do not use for a single date difference or for daily to-do planning.
Public scan report
scanner v0.1.10 · 2026-10-25 · same rubric, same numbers if you re-run it
- –Code scanremote-only server, no package to scann/a
- Live reliabilityremote reachable in 690ms20/20
- Tool poisoning2 tool descriptions checked15/15
- Auth qualityopen endpoint, read-only tools10/15
- Maintenanceno repository listed3/15
- Maintainer identityno repository or website to verify2/10
Findings (1)
- lowNo source repository listed
maint.no-repo
How Zovo Project Timeline compares
Against every graded MCP server, from our own scans and uptime checks. Updated after each scan run.
- Safety score
- 67/100
- higher than 25% of 48,255 servers
- Tools
- 2
- the typical server has 7
- Tools that change things
- 0%
- typical: 0%. Fewer write tools means less an agent can break
- Uptime
- 100%
- of our recent checks; the typical remote server answers 100%
- Response time
- 244 ms
- faster than 56% of 30,031 servers
What its tools let an agent do: 2 read
Install Zovo Project Timeline in Claude Code, Cursor or VS Code
claude mcp add --transport http gantt-timeline https://gantt-timeline.zovo.one/mcp
Zovo Project Timeline: common questions
- Is Zovo Project Timeline MCP server safe?
- With care: it is graded C, so read the findings first (67/100). Read the Zovo Project Timeline safety report
- How do I install Zovo Project Timeline?
- It runs remotely at gantt-timeline.zovo.one. Add it to Claude Code, Cursor, VS Code or Claude Desktop with the snippets above, or call it through the mcp.market gateway without installing anything.
- Does Zovo Project Timeline need an API key?
- Not as far as the registry entry and our scan can tell: no credentials are declared or required.
- Is Zovo Project Timeline maintained?
- The latest release is v1.0.0.
- Is Zovo Project Timeline up?
- 100% of our last 28 checks got an answer. We check remote servers about four times a day.
- What can I use instead of Zovo Project Timeline?
- Servers from other publishers that do the same job: TradingMCP MCP server.
- How does Zovo Project Timeline compare with other MCP servers?
- safety score 67/100 (higher than 25% of 48,255 servers); tools 2 (the typical server has 7); tools that change things 0% (typical: 0%. Fewer write tools means less an agent can break). Full comparison.
Alternatives to Zovo Project Timeline
Same job from other publishers: the closest match first, then the best rated.
- TradingMCPMarket analysis for AI assistants: screeners, multi-timeframe analysis, backtests, in-chat charts.not reviewedEstablishedA