Microsoft Project MCP server
Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.
9 stars
Reviews
Write oneNobody has reviewed Microsoft Project yet.
If you have run it, two minutes of your experience saves the next person an afternoon.
Microsoft Project tools
No tool declarations could be read from the package source. They show once the server is installed.
Public scan report
scanner v0.1.10 · 2026-11-03 · same rubric, same numbers if you re-run it
- –Code scanpackage could not be scannedn/a
- –Live reliabilityno gateway calls yet and no remote to proben/a
- –Tool poisoningtools not inspected (local package is not executed); not countedn/a
- Auth qualitylocal package, no credentials required12/15
- Maintenancelast push 6 days ago15/15
- Maintainer identityregistry namespace matches repository owner7/10
How Microsoft Project compares
Against every graded MCP server, from our own scans and uptime checks. Updated after each scan run.
- Safety score
- 85/100
- higher than 70% of 48,255 servers
- GitHub stars
- 9
- more than 87% of 28,688 servers
Release history: 7 versions in the registry since 2026-08-04, latest 2026-10-20, typically one every 5 days.
Install Microsoft Project in Claude Code, Cursor or VS Code
The registry entry has no remote endpoint or installable package.
What the publisher says
From the Microsoft Project repository's README, as published. We do not edit it. Read it on GitHub
Horizun Project MCP
An MCP server for Microsoft Project that needs neither Java nor Microsoft Project — and tells you the truth about what it wrote.
Español
<!-- mcp-name: io.github.HorizunGroup/horizun-msproject-mcp --> <!-- The registry verifies ownership by finding that name in the published package's README. It has to travel inside the NuGet package, which is why it lives here rather than in a metadata file. -->
Point any MCP client at a .mpp, a Primavera .xer, or an MSPDI .xml and ask real questions: where the critical path runs, which resources are overbooked, whether the schedule would survive a DCMA audit, what a two-week slip actually does to the finish date. Then write changes back — and know which ones landed, because every one is re-read from the model before it is reported.
dotnet tool install -g HorizunMsProjectMcpThat is the whole install. No JVM. No Microsoft Project. No licence. It reads and schedules on its own.
Connect a client
Full per-client instructions, including the plugin route and uninstall, are in docs/INSTALL.md.
Why this one
There are a handful of Microsoft Project MCP servers. Every one of them requires Java, or a licensed Microsoft Project install, or a paid JDBC driver — and on the machine this was built on, none of them would start. Seven things here are not available anywhere else:
Shortened. The full README is on GitHub.
Nothing above is checked by us. What we check is on the safety report.
Microsoft Project: common questions
- Is Microsoft Project MCP server safe?
- Yes, by our scan: it is graded A (85/100). Read the Microsoft Project safety report
- Does Microsoft Project need an API key?
- Not as far as the registry entry and our scan can tell: no credentials are declared or required.
- Is Microsoft Project maintained?
- The last commit was 8 days ago (2026-10-27). The latest release is v1.6.1.
- How does Microsoft Project compare with other MCP servers?
- safety score 85/100 (higher than 70% of 48,255 servers); github stars 9 (more than 87% of 28,688 servers). Full comparison.