MCP.Market

Nigeria Electricity MCP server

by Braynexservices·io.github.Braynexservices/nigeria-electricity·v0.2.6

Read-only Nigerian electricity meter validation + DisCo list via VTpass (free keys). No payments.

B77/100grade B
What users say
No reviews yet
Be the first
Safety scan
B77/100

full report

Adoption
New

0 stars40 downloads/wk

Reviews

Write one

Nobody has reviewed Nigeria Electricity yet.

If you have run it, two minutes of your experience saves the next person an afternoon.

Nigeria Electricity tools (2)

write = sends, deletes, buys or posts

Read from the package source without running it. The installed server may list more.

  • list_discos

    List supported Nigerian electricity distribution companies (DisCos) with their codes.

  • validate_meter

    Validate an electricity meter (read-only) and return the registered customer name/address and DisCo.

Public scan report

scanner v0.1.9 · 2026-09-25 · same rubric, same numbers if you re-run it

no findings
  • Code scan15 source files scanned25/25
  • –Live reliabilityno gateway calls yet and no remote to proben/a
  • –Tool poisoningtools not inspected (local package is not executed); not countedn/a
  • Auth qualitystatic API keys via environment variables6/15
  • Maintenancelast push 68 days ago12/15
  • Maintainer identityregistry namespace matches repository owner7/10
Overall 77/100. Components that don't apply are left out of the denominator. Any critical finding is an F.RubricAppeal a findingJSON

How Nigeria Electricity compares

Against every graded MCP server, from our own scans and uptime checks. Updated after each scan run.

Safety score
77/100
higher than 50% of 48,255 servers
Tools
2
the typical server has 7
Tools that change things
0%
typical: 0%. Fewer write tools means less an agent can break
Downloads a week
40
more than 31% of 12,191 servers with a package

What its tools let an agent do: 2 read

Install Nigeria Electricity in Claude Code, Cursor or VS Code

Runs npx -y @braynexservices/nigeria-mcp-electricity on your machine. Read the scan report first; the gateway never runs local packages.

claude mcp add nigeria-electricity -- npx -y @braynexservices/nigeria-mcp-electricity
Add to Cursor

What the publisher says

From the Nigeria Electricity repository's README, as published. We do not edit it. Read it on GitHub

Nigeria MCP — Nigerian data for AI agents

A Braynex Services Ltd product. Author: Samuel Orie. License: MIT.

Clean, normalized Nigerian business & local data exposed to AI agents (Claude, Cursor, custom agents) as MCP tools — one server per data source, each behind a typed provider seam.

Status: 12 servers LIVE on npm (the original 4 also on the official MCP Registry). Every server runs offline on a mock provider with zero signup; live data is one env var and every new lane is keyless (admin-divisions runs fully offline — it has no live data source).

Products

Shortened. The full README is on GitHub.

Nothing above is checked by us. What we check is on the safety report.

Nigeria Electricity: common questions

Is Nigeria Electricity MCP server safe?
Mostly: it is graded B (77/100). Read the Nigeria Electricity safety report
How do I install Nigeria Electricity?
It runs on your machine. Copy the Claude Code, Cursor, VS Code or Claude Desktop config from the install section.
Does Nigeria Electricity need an API key?
Yes. The registry entry asks for VTPASS_API_KEY, VTPASS_SECRET_KEY.
Is Nigeria Electricity maintained?
The last commit was 108 days ago (2026-07-19). The latest release is v0.2.6.
How does Nigeria Electricity compare with other MCP servers?
safety score 77/100 (higher than 50% of 48,255 servers); tools 2 (the typical server has 7); tools that change things 0% (typical: 0%. Fewer write tools means less an agent can break). Full comparison.

More from Braynexservices →