by Donchitos·Donchitos/Claude-Code-Game-Studios·25k stars·MIT

Fast, concise sprint snapshot — burndown and emerging risks for situational awareness. 'How is the sprint going?'

A100/100content scan

Is the sprint-status skill safe?

Clean: nothing in its files matched our rules. We read 1 file in the folder on 2026-09-28.

No findings.

Install the sprint-status skill

A skill is a folder. Copy it into your agent's skills folder and the agent loads it when the task matches its description.

git clone --depth 1 https://github.com/Donchitos/Claude-Code-Game-Studios.git /tmp/Claude-Code-Game-Studios
mkdir -p ~/.claude/skills
cp -r /tmp/Claude-Code-Game-Studios/.claude/skills/sprint-status ~/.claude/skills/sprint-status
available in every project

In the Claude apps, zip the folder and upload it from the Skills settings. The folder on GitHub

The instructions your agent would load

SKILL.md as published, without the frontmatter. Read it on GitHub

!bash "${CLAUDESKILLDIR}/../../hooks/yaml-helper.sh" resolveconfig --keys storygranularity

Sprint Status

This is a fast situational awareness check, not a sprint review. It reads the current sprint plan and story files, scans for status markers, and produces a concise snapshot in under 30 lines. For detailed sprint management, use /sprint-plan update or /milestone-review.

This skill is read-only. It never proposes changes, never asks to write files, and makes at most one concrete recommendation.

storygranularity — it sets the grain of the burn-down read: feature-sized chunks at coarse, task-sized at balanced (default), AC-sized** at fine.

1. Find the Sprint

Argument: $ARGUMENTS[0] (blank = use current sprint)

production/sprints/ for a file matching sprint-03.md, sprint-3.md, or similar. Report which file was found.

  • If an argument is given (e.g., /sprint-status 3), search

production/sprints/ and treat it as the current sprint.

  • If no argument is given, find the most recently modified file in

files found. Start a sprint with /sprint-plan new." Then stop.

  • If production/sprints/ does not exist or is empty, report: "No sprint

Read the sprint file in full. Extract:

Nice to Have), owner, and estimate

  • Sprint number and goal
  • Start date and end date
  • All story or task entries with their priority (Must Have / Should Have /

2. Calculate Days Remaining

Using today's date and the sprint end date from the sprint file, calculate:

  • Total sprint days (end minus start)
  • Days elapsed
  • Days remaining
  • Percentage of time consumed

If the sprint file does not include explicit dates, note "Sprint dates not found — burndown assessment skipped."

3. Scan Story Status

First: check for production/sprint-status.yaml.

If it exists, read it directly — it is the authoritative source of truth. Extract status for each story from the status field. No markdown scanning needed. Use its sprint, goal, start, end fields instead of re-parsing the sprint plan.

If sprint-status.yaml does not exist (legacy sprint or first-time setup), fall back to markdown scanning:

Read the file and scan for status markers: DONE, COMPLETE, IN PROGRESS, BLOCKED, NOT STARTED (case-insensitive).

  1. If the entry references a story file path, check if the file exists.

sprint plan itself for status markers next to that entry.

  1. If the entry has no file path (inline task in the sprint plan), scan the
  1. If no status marker is found, classify as NOT STARTED.
  2. If a file is referenced but does not exist, classify as MISSING and note it.

When using the fallback, add a note at the bottom of the output: "⚠ No sprint-status.yaml found — status inferred from markdown. Run /sprint-plan update to generate one."

Optionally (fast check only — do not do a deep scan): grep the code root for a directory or file name that matches the story's system slug to check for implementation evidence. This is a hint only, not a definitive status.

Stale Story Detection

After collecting status for all stories, check each IN PROGRESS story for staleness:

— a date is a single line, and opening every in-progress story to find it is the whole cost of this check:

  • Resolve the dates with one grep across the story set, not a read per story
Grep pattern="\*{0,2}(Last Updated|Updated|last-updated|updated_at)\*{0,2}[[:space:]]*:" glob="production/epics/**/story-*.md" output_mode="content"

That one pattern accepts every field-name variant. A story with no match has no date, which is not the same as being stale — report it as "never stamped" and do not compute an age for it.

The \{0,2} wrappers are why this works at all.** /create-stories emits

> Last Updated: …, so a pattern requiring : immediately after the word

matched no story ever written. Combined with the "no match = never stamped"

rule directly above — which is correct in itself — the failure was completely

silent: every in-progress story reported as never stamped, and stale-story

detection never once fired. A bare Updated: anchor will regress it.

  • Calculate days since that date using today's date.
  • If the date is more than 4 days ago, flag the story as STALE. (4-day threshold accounts for weekends — a story last touched on Friday won't appear stale until Wednesday.)
  • If no date field is found in the story file, note "no timestamp — cannot check staleness."
  • If the story has no referenced file (inline task), note "inline task — cannot check staleness."

STALE stories are included in the output table and collected into an "Attention Needed" section (see Phase 5 output format).

Stale story escalation: If any IN PROGRESS story is flagged STALE (no progress in 4+ days), the burndown verdict is upgraded to at least At Risk — even if the completion percentage is within the normal On Track window. Record this escalation reason: "At Risk — [N] story(ies) with no progress in [N] days."

4. Burndown Assessment

Calculate:

  • Tasks complete (DONE or COMPLETE)
  • Tasks in progress (IN PROGRESS)
  • Tasks blocked (BLOCKED)
  • Tasks not started (NOT STARTED or MISSING)
  • Completion percentage: (complete / total) * 100

Assess burndown by comparing completion percentage to time consumed percentage:

  • On Track: completion % is within 10 points of time consumed % or ahead
  • At Risk: completion % is 10-25 points behind time consumed %
  • Behind: completion % is more than 25 points behind time consumed %

If dates are unavailable, skip the burndown assessment and report "On Track / At Risk / Behind: unknown — sprint dates not found."

5. Output

Keep the output concise. The story status table is mandatory — do not truncate it. Aim for under 50 lines total; omit the Emerging Risks section if nothing notable was found. Use this format:

## Sprint [N] Status — [Today's Date]
**Sprint Goal**: [from sprint plan]
**Days Remaining**: [N] of [total] ([% time consumed])

### Progress: [complete/total] tasks ([%])

| Story / Task         | Priority   | Status      | Owner   | Blocker        |
|----------------------|------------|-------------|---------|----------------|
| [title]              | Must Have  | DONE        | [owner] |                |
| [title]              | Must Have  | IN PROGRESS | [owner] |                |
| [title]              | Must Have  | BLOCKED     | [owner] | [brief reason] |
| [title]              | Should Have| NOT STARTED | [owner] |                |

### Attention Needed
| Story / Task         | Status      | Last Updated   | Days Stale | Note           |
|----------------------|-------------|----------------|------------|----------------|
| [title]              | IN PROGRESS | [date or N/A]  | [N days]   | [STALE / no timestamp — cannot check staleness / inline task — cannot check staleness] |

*(Omit this section entirely if no IN PROGRESS stories are stale or have timestamp concerns.)*

### Burndown: [On Track / At Risk / Behind]
[1-2 sentences. If behind: which Must Haves are at risk. If

6. Fast Escalation Rules

Apply these rules before outputting, and place the flag at the TOP of the output if triggered (above the status table):

Critical flag — if Must Have stories are BLOCKED or NOT STARTED and less than 40% of the sprint time remains:

SPRINT AT RISK: [N] Must Have stories are not complete with [X]% of sprint
time remaining. Recommend replanning with `/sprint-plan update`.

Completion flag — if all Must Have stories are DONE:

More skills from Donchitos/Claude-Code-Game-Studios

  • AadoptBrownfield audit — do existing artifacts actually work? Numbered migration plan. Unlike /project-stage-detect, checks compliance not existence.
  • Aarchitecture-decisionCreate an ADR documenting a technical decision: context, alternatives considered, consequences.
  • Aarchitecture-reviewTraceability matrix mapping GDD requirements to ADRs. Finds gaps, cross-ADR conflicts, engine compatibility. PASS/CONCERNS/NOT ASSESSED/FAIL.
  • Aart-bibleAuthor the Art Bible — visual identity gating asset production. Run before /map-systems.
  • Aasset-auditAudit assets against naming conventions, file size budgets, format standards. Finds orphaned assets, missing references.
  • Aasset-specPer-asset visual specs plus AI generation prompts from GDDs and character profiles. After the art bible.
  • Abalance-checkFind balance outliers, broken progressions, degenerate strategies, economy imbalances in formulas and data. 'Check game balance'.
  • AbrainstormGuided concept ideation using professional studio techniques, player psychology, creative exploration.
  • Abug-reportStructured bug report from a description, or analyze code for potential bugs. Reproduction steps, severity.
  • Abug-triageRe-evaluate open bugs — priority vs severity, assign to sprints, surface systemic trends. Run when the count grows.
  • AchangelogAuto-generate a changelog from git commits and sprint data. Internal and player-facing versions.
  • Acode-reviewArchitectural code review — coding standards, SOLID, testability, performance concerns.

All agent skills → · MCP servers