Watt Street — US grid, interconnection queue and data center power MCP server
How long to get grid power in any US county. 39,173 filings, 1,574 counties, dated sources.
C62/100grade C
Adoption
New
Little public usage data yet
Reviews
Write oneNobody has reviewed Watt Street — US grid, interconnection queue and data center power yet.
If you have run it, two minutes of your experience saves the next person an afternoon.
Watt Street — US grid, interconnection queue and data center power tools
Tool list not cached yet. `describe` through the gateway fetches it live.
Public scan report
scanner v0.1.9 · 2026-09-19 · same rubric, same numbers if you re-run it
1 low
- –Code scanremote-only server, no package to scann/a
- Live reliabilityremote reachable in 364ms; handshake note: Server's protocol version is not supported: 2026-07-2820/20
- –Tool poisoningtools not inspected (endpoint requires auth); not countedn/a
- Auth qualityopen endpoint, read-only tools10/15
- Maintenanceno repository listed3/15
- Maintainer identityverified namespace with website, no repo4/10
Findings (1)
- lowNo source repository listed
maint.no-repo
Overall 62/100. Components that don't apply are left out of the denominator. Any critical finding is an F.RubricAppeal a findingJSON
Install directly
claude mcp add --transport http grid https://api.wattstreet.net/mcp
Watt Street — US grid, interconnection queue and data center power: common questions
- Is Watt Street — US grid, interconnection queue and data center power MCP server safe?
- With care: it is graded C, so read the findings first (62/100). Read the Watt Street — US grid, interconnection queue and data center power safety report
- How do I install Watt Street — US grid, interconnection queue and data center power?
- It runs remotely at api.wattstreet.net. Add it to Claude Code, Claude Desktop or Cursor with the snippets above, or call it through the mcp.market gateway without installing anything.
- Does Watt Street — US grid, interconnection queue and data center power need an API key?
- Not as far as the registry entry and our scan can tell: no credentials are declared or required.
- Is Watt Street — US grid, interconnection queue and data center power maintained?
- The latest release is v1.2.0.
- Is Watt Street — US grid, interconnection queue and data center power up?
- 100% of our last 5 checks got an answer. We check remote servers about four times a day.