Is Cpp Cpm Engine MCP server safe?
Yes, with the usual care.
Safe to use. Minor gaps such as a missing repository or slower maintenance.
What to know before installing
- highWrite-action tools reachable without authentication
Public scan report
scanner v0.1.9 · 2026-09-20 · same rubric, same numbers if you re-run it
1 high1 low
- –Code scanremote-only server, no package to scann/a
- Live reliabilityremote reachable in 848ms20/20
- Tool poisoning13 tool descriptions checked13/15
- Auth qualityopen endpoint exposes 1 write-action tools with no auth3/15
- Maintenancelast push 4 days ago15/15
- Maintainer identityregistry namespace matches repository owner; GitHub account older than a year8/10
Findings (2)
- highWrite-action tools reachable without authentication
auth.open-write - lowUnusually long tool description (over 2,000 characters)
poison.long-descriptiontool forensic_windows_analysis: …Run forensic windows analysis (AACE RP 29R-03 §3.3, MIP 3.3 Observational / Dynamic / Contemporaneous As-Is) across multiple Primavera P6 XER snapshots and return the full analysis dict. This is the headline forensic tool — it computes per-window completion shifts, per-window slip registers (per-activity slip with critical/non-critical flag), per-window duration growth on critical-path activities, per-window per-party attribution (Owner / Contractor / Concurrent / Force Majeure / Unattributed), and cumulative project drift from baseline. The attribution math satisfies the CPP conservation check, per the AACE 29R-03 §3.3.E.13 requirement that the summed per-period net impacts equal the difference between the first schedule update and the last schedule update used in the evaluation (per-party day buckets sum to project drift within ±1 day, no cascade-double- counting). Use this tool for the full multi-window forensic claim. If you already have a windows result and only want the per-window × per-party grid view, call ``concurrent_delay_matrix`` instead. Args: schedules: list of dicts in chronological order. Minimum 2 entries (baseline + at least one update). Each dict must contain ``label`` (str) and EXACTLY ONE of: - ``xer_path`` — server-side filesystem path, OR - ``xer_content`` — full XER text content. Use ``xer_content`` when calling a hosted MCP server from a remote client whose XER lives locally. project_name: optional override; auto-picked from XER if "". baseline_idx: which entry in ``schedules`` is the contract baseline (default 0 = first one). entitlement_milestone: optional task_code (e.g. "Ready for Takeover") — recorded on the result, not used for math. output_dir: optional dir for HTML dashboard / DOCX report. If "", a tempdir is used and dropped after — the dashboard / report paths in the response will point to the temp location (caller responsible for moving them). Returns: { "analysis": full dict from run_windows() with keys: "windows", "cumulative", "baseline_label", "data_dates", "attribution_summary", "mcpm_attribution", ..., "dashboard": path to HTML dashboard (server-side), "report": path to DOCX executive report (server-side), "baseline_stability": {"worst_severity", "has_block", ...} } On failure: {"error": "..."} with no schedules processed. …
Overall 79/100. Components that don't apply are left out of the denominator. Any critical finding is an F.RubricAppeal a findingJSON